TriSeadon Shipyard expansion.docx
- Precedence rank: 13 (newest = rank 1).
- Effective date used for conflict resolution: 2025-11-07 (file-mtime).
- Coverage guarantee: full extracted text is included below line-by-line.
- Conflict rule: if this source conflicts with older-ranked sources, this source controls.
Original document: TriSeadon Shipyard expansion.docx
Implementation Notes
- This page is the canonical website inclusion record for this source document.
- Cross-page policy/content updates should follow source precedence order from Source Library and Precedence.
- Any conflicting older directive is superseded by newer dated directives.
Full Extract
1. Assumptions (Post–Industrial Base Build-Out)
• FFG: 500’ OAL × 68’ beam × 10,000t
• DDG: 650’ OAL × 88’ beam × 15,000t
• CAG: 800’ OAL × 108’ beam × 32,000t
Cost Drivers
• Yard efficiency gains:
• GOCO model = reduced profit margins (lease revenue substitutes some profit).
• Legacy yards = lowest cost (time + materials only).
• Private yards = slightly higher, but offset by loan assistance.
• DLA bulk buys: –10 to –15% per hull (steel, turbines, radars, VLS, pods).
• ISO & Node yards: Pre-outfitting cuts labor ~8–10%.
• Standardization across classes: Shared IMMs, IWMs, Cerberus mounts, radars, powerplants = reduced design churn.
2. Construction Time per Class
• FFG:
• Legacy US builds: ~36 months.
• TriSeadon modular method: 24 months per hull (parallel outfitting, JIT supply).
• DDG:
• Legacy Arleigh Burke Flight III: ~72 months.
• TriSeadon: 48 months per hull (fewer design changes, larger yards, modular inserts).
• CAG:
• Comparable to CGN/large CVN auxiliaries (5+ years historically).
• TriSeadon: 60 months per hull (standardized heavy-lift modules, fewer bespoke systems).
3. Cost per Ship (2025–2035 $ Estimates)
Baseline: Current U.S. Programs
• FFG-62: ~$1.4–1.6B each (and slipping higher).
• DDG-51 Flight III: ~$2.2–2.5B each.
• CG/large combatants: ~$6–7B if built today.
TriSeadon Adjusted Costs
• FFG: ~$1.25B → $1.0–1.1B each
• Savings: DLA steel bulk buy ($50–70M), GOCO/legacy margin cut (~$50–100M).
• DDG: ~$2.5B → $2.0–2.2B each
• Savings: Bulk VLS buys ($100–150M), standardized radar/powerplant (~$100M).
• CAG: ~$6B → $4.5–5.0B each
• Savings: Scale on steel & power ($250–300M), module standardization (~$200M).
4. Comparative Summary
Class
Displacement
Build Time
Legacy Cost (est.)
TriSeadon Cost
% Savings
FFG
~10,000t
24 mo
$1.4–1.6B
$1.0–1.1B
20–30%
DDG
~15,000t
48 mo
$2.2–2.5B
$2.0–2.2B
10–15%
CAG
~32,000t
60 mo
$6–7B
$4.5–5.0B
20–25%
✅ Bottom Line
• FFGs: Big winners — TriSeadon beats the troubled FFG-62 program by ~$400–600M per hull and delivers 1/3 faster.
• DDGs: Slightly cheaper but much faster — cutting 2 years off build cycle keeps fleet numbers up.
• CAGs: Still expensive, but $1.5–2B cheaper than comparable legacy cruisers; standardized modules make sustainment easier.
The real gain isn’t just per-hull cost but throughput: with parallel lanes, ISO nodes, and DLA buffers, the Navy avoids bottlenecks that have plagued every major program since the Cold War.
A. National “Capital” GOCO Yards (2 total, $5B each)
1. Mare Island, Vallejo, CA (West Coast)
• Ownership: Former Navy shipyard (federal land, much of it transferred to Vallejo but could potentially be re-acquired by federal action, purchase or land swap and congressional approval).
• Footprint: ~1,400 acres (ample for 3 graving docks, 5 slipways, 5 piers, large module halls, storage).
• Infrastructure: Legacy drydock basins already exist, though major modernization required; deep-water access via San Pablo Bay.
• Capacity: 1 × Large (CAG) build lane, 1 × large refit dock, 2 × Medium (DDG/FFG) build lanes.
• Workforce: Bay Area + Central Valley, legacy shipyard labor pool, strong regional tech base.
• Investment: ~$5B modernization to create a full capital yard and cover Brownfield cleanup.
• Risk: Requires re-acquisition from City of Vallejo (political and legal complexity).
• Pros: Historic Navy site, proven deepwater, potential flagship yard west of Mississippi.
2. Port of Brownsville, TX (Gulf Coast)
• Ownership: ~40,000 acres controlled by Port of Brownsville (public navigation district).
• Candidate Parcel: ~302 acres currently marketed for industrial/maritime use (unpriced, but likely $15M–$60M based on comps).
• Infrastructure: 17-mile channel, ~42 ft draft (authorized deepening to 52 ft), on-dock rail, barge and truck access.
• Capacity: 1 × CAG build lane, 1 × large refit dock, 2 × Medium (DDG/FFG) build lanes.
• Investment: ~$5B for graving docks, Goliath cranes, module halls, logistics facilities. Hurricane hardening (N+1 power, onsite gen, surge protections
• Pros: Massive publicly owned port land; deepwater access; large labor pool from Gulf Coast ship/energy industries.
• Cons: Politically sensitive to repurpose land from a thriving commercial port; would require federal–state negotiation or federally driven reallocation.
B. Regional GOCO Yards (3 total, $3B each, except Marinette at $1B)
3. Marinette, WI (Great Lakes)
• Ownership: Formerly federal (BRAC); now operated by Fincantieri Marinette Marine. Could potentially be re-acquired via negotiated settlement.
• Footprint: ~300 acres, proven DDG/FFG new construction yard.
• Capacity: 2 × Medium (DDG/FFG) build lanes, 1 × medium refit.
• Investment: ~$1B for modernization into modular GOCO.
• Pros: Experienced shipbuilding workforce, existing infrastructure.
• Cons: Currently under private control—would require federal reacquisition.
• Possible replacements if Fincantieri won’t settle: NCBC Gulfport MS, Lake Charles, LA
4. Radio Island, Morehead City, NC (East Coast)
• Ownership: ~154 acres state-owned under NC Ports (within a 200-acre port complex). Expandable via dredge fill.
• Depth: 45–47 ft channel at Beaufort Inlet, no air-draft limits.
• Capacity: 2 × Medium (DDG/FFG) build lanes, 1 × medium refit, ISO/module support.
• Investment: ~$3B for slips, drydocks, and module halls.
• Workforce: Eastern NC labor pool (Onslow, Craven, Pitt Counties); strong pipeline from MCAS Cherry Point (≈3,800+ civilians/military) and Camp Lejeune (≈6,000+ civilians) for skilled trades.
• Pros: Public/state-controlled land; fewer existing conflicts than Charleston.
• Cons: Requires cooperation from NC Ports and state government; some dredging/land reclamation needed.
5. Port Tampa Bay, FL (Southeast)
• Ownership: Hillsborough County Port Authority (public).
• Footprint: ~1,000 acres industrial land, with parcels suitable for 250+ acres dedicated to shipyard. (portoftampa.com)
• Depth: 43 ft today, with federal project to deepen to ~47 ft under way. (portoftampa.com)
• Capacity: 2 × Medium (DDG/FFG) build lanes, 1 × Medium (DDG/FFG) refit, ample space for ISO/module shops and logistics staging.
• Workforce: Tampa/St. Petersburg metro area (~3.2M population) provides a large, relatively untapped industrial and veteran workforce.
• Pros: Public ownership (no private eminent domain); major port with planned deepening; large workforce outside existing Navy shipbuilding hubs.
• Cons: Shared with commercial and cruise shipping—would need careful site selection and coordination to avoid disruption.
1. National Shipyard Expansion
A. New GOCO Capital Yards (Flagships – $5B each)
Mare Island Vallejo CA & Brownsville Tx
• Land: Former Navy/industrial bases; re-aquired under federal control.
• Lanes:
• 1 × Large (CAG/DDG/FFG) build
• 1 × Large refit (CAG/DDG/FFG)
• 2 × Medium (DDG/FFG) build
• Cranes: 600-ton Goliaths at each lane
• Cost: $5B each.
• Timeline: 2026–2032.
• ROI: 2–3% lease = $100–150M/yr per yard (perpetual lease income).
• Governance: Navy retains control; vendors lease lanes. Performance points system: on-time/under budget = +points (expand contracts); late/over budget = –points (risk replacement).
B. New GOCO Regional Yards ($3B each, Marinette $1B)
Tampa Bay FL, Radio Island NC, Marinette (WI)
• Land:
• Tampa Bay/ Radio Island: State Port Authority/DoD property.
• Marinette: transferred from Fincantieri under forfeiture settlement (yard acquired free; Navy invests $1B modernization).
• Lanes:
• 2 × Medium (DDG/FFG) build
• 1 × Medium refit (DDG/FFG)
• Cranes: 600-ton Goliaths per lane.
• Cost: $3B each (Charleston, Ingleside); $1B (Marinette).
• Timeline: 2026–2031.
• ROI: $60–90M/yr lease per yard.
• Governance: Same performance point system as capital GOCO yards.
C. Legacy Navy Yards (Navy-Run, Direct Federal Spend)
Norfolk (VA), Portsmouth (ME), Puget Sound (WA), Philadelphia (PA), Pearl Harbor (HI)
• Lanes:
• Norfolk: 1x Medium Build (DDG/FFG)
• Portsmouth: 1x Medium Build (DDG/FFG)
• Puget Sound: 1x Medium Build (DDG/FFG)
• Philadelphia: 1x Medium Build (DDG/FFG)(reclaim & modernize, $2B)
• Pearl Harbor: 1 × Large refit (CAG/DDG/FFG)
• Cranes: 600-ton Goliaths per lane.
• Cost: 4 × $1B + 1 × $2B = $6B.
• Timeline: 2027–2035.
• ROI: No income, lowest cost hulls (time + materials, no margin) overtime ROI.
• Strategic Role: Baseline comparison for GOCO/private yards; training pipelines; nuclear/CVN/SSN sustainment.
D. Private Yards (Loan-Assisted Expansion)
• Sites: 10 (Gulf, Great Lakes, East, West) — excluding DDG-51 program yards.
• Lanes: 1x Medium (DDG/FFG) build and/or 1x Medium (DDG/FFG) refit lane with 1x 600t crane.
• Cost: $500M each = $5B total.
• Funding: 1% fixed federal loans, repayment begins after first hull.
• Timeline: 2027–2035.
• ROI: Net-neutral — ~$5.75B repaid on $5B loans.
• Strategic Role: Widens base, creates control factors to measure against GOCO/legacy performance, uses skilled contractors to set training and skills for other yards.
E. ISO & Module Yards (State Partnerships)
• Sites: 20 across 20 states.
• Scale: 5–20 acre facilities.
• Products: ISO pods, berthing nodes, Cerberus CIWS mounts
• Cranes: Container cranes/forklifts only.
• Cost: $250M each = $5B total.
• 50/50 split: $2.5B federal loan @2% + $2.5B state/local.
• Timeline: 2026–2030.
• ROI: Loan fully repaid (~$2.9B). States keep jobs; federal cost ~0.
• Strategic Role: Expands political footprint to 20+ states; keeps module supply distributed.
2. Defense Logistics Agency (DLA) Supply Chain Model
A. Central Procurement
• DLA = single buyer of steel, engines, turbines, radars, VLS, batteries, IMMs, IWMs, Odyssey pods, Cerberus CIWS, DEW.
• Buys 10–20 shipsets at a time; reduces cost 10–15%.
• Steel requires new domestic naval-grade mills (Midwest/South). Federal loans finance upgrades.
B. Depots & Logistics
• 4 regional depots:
• East Coast (Norfolk/Philly)
• Gulf Coast (Mobile/Ingalls)
• West Coast (SF Bay Area)
• Midwest (Great Lakes/Marinette)
• Store shipsets, modules, ISOs; deliver JIT to yards.
C. Strategic Inventory Doctrine
• Baseline: 10 FFG + 10 DDG + 4 CAG shipsets (24 ships).
• Golden Rule: If inventory vs build conflicts → build wins. No yard sits idle.
• Scale-up:
• 2026–30: 2–3 FFG + 1–2 DDG sets.
• 2030–35: 5 FFG + 5 DDG + 2 CAG.
• 2035+: steady 10/10/4 floor.
D. Funding
• 2026–30: $3–4B (steel mill loans, depot builds, turbine contracts).
• 2030+: $1.5–2.5B annually (sustain reserves + active builds).
• Steel mill loans repaid at 2–3%.
3. Financial Picture
Category
Sites
Cost
ROI/Repayments
Net Federal Impact
New GOCO Flagships
2
$10B
$200–300M/yr lease
$10B
New GOCO Regionals
3
$7B
$180–270M/yr lease
$7B
Legacy Navy Yards
5
$6B
None (cheapest hulls)
$6B
Private Yards
10
$5B loans
~$5.75B repaid
≈0
ISO/Module Yards
20
$2.5B fed loans + $2.5B states
~$2.9B repaid
≈0
Steel Mills & Depots
—
$3–4B loans
Repaid at 2–3%
≈0
Gross Federal Outlay: ~$31–32B
Repayments: ~$11–12B
Net Federal Cost: ~$19–21B over 6–8 years
Ongoing Lease ROI: ~$380–570M/yr (GOCO yards)
4. Timeline (Phases)
• 2026–2029: Marinette online (2 FFG lanes). ISO yards in first 10 states. Tampa/Radio construction.
• 2028–2032: Mare Island & Brownsville (CAG build/refit). Tampa/Radio DDG lanes open. First legacy yards (VA, ME, WA) online.
• 2030–2035: Philadelphia DDG lane active. Pearl Harbor CAG refit ready. All ISO yards finished. Private yard expansions complete.
• 2035+: Full national capacity online: ~14 DDG/FFG buildways, 10 DDG/FFG drydocks, 2–3 CAG docks, 17 fit-out berths. Steady state: 8 FFG/yr, 6 DDG/yr, 2 CAG/yr + parallel refits.
✅ Why This Works
• Control: GOCO yards federally owned — Navy can swap out poor performers without losing capacity.
• Performance Management: Lease point system enforces accountability (On-Time/On-Budget = rewarded; late/over = penalized).
• Redundancy & Competition: 5 GOCO, 5 Navy-run, 10 private = three comparative streams; prevents bottlenecks.
• 5 new GoCo shipyards are in new workforce areas providing untapped labor options.
• Resilience: DLA keeps 24 shipsets in reserve but prioritizes throughput (no idle yards).
• Steel Security: Federal loans ensure U.S. naval steel capacity expands without taxpayer-owned mills.
• Politics: 25–30 states benefit via GOCO, legacy, private, and ISO yards.
• Redundancy in case of vendor failure, weather, war access to multiple shipyards to continue building refitting ships throughout the TriSeadon program.
• Affordability: Net Federal spend ~$20B, easily absorbed by Navy’s $40–47B annual shipbuilding budget.
• Return: GOCO yards generate ~$400–600M/yr lease income; legacy yards lower per-hull costs; private/ISO/state yards repay loans.