Mission-Configuration Rules

Different Module Types Change the Ship at Different Times

Open Refit Doctrine

IMM / IWM Build and Major Refit Sequence

IMM / IWM Bay IMM Build / Major Refit Only Heavy mission modules enter when the hull is open and yard cranes have full structural access. 1. Hull open 2. Module lowered 3. Structural lock-in

ISO Port-Swap Sequence

ISO Mission Rail ISO Port-Side Mission Swap ISO mission packages can be rolled on or off in port without waiting for a major refit or reopening structural spaces. 1. Return to port 2. Remove old package 3. Slide new package aboard