Eight-Mount Baseline
This configuration study overlays the CAG's eight fixed Cerberus positions. It does not replace the clean approved CAG-3 ship rendering.
CAG-3 installation study. The locked placement list below controls the eight-position arrangement.
Locked Placement
- Positions 1 and 2: port and starboard on the forward bridge roof, oriented for forward coverage.
- Position 3: aft-facing position on the forward-superstructure roof.
- Position 4: centered on the forward terrace of the aft aviation-superstructure roof.
- Positions 5 and 6: aft-oriented positions, one port and one starboard of ATC.
- Positions 7 and 8: port and starboard at the forward end of the aft gun deck, clear of the centerline Trinion turret and flight deck.
- Scale: each position uses the 15-foot Cerberus foundation. The 100-foot hangar roof and 60-foot ATC preserve approximately 20 feet per side for the two ATC-flank positions.