Reviewed August 2026

Status Rules

Operational: fielded capability. Existing / integration required: underlying technology exists but TriSeadon qualification is new. Developmental: proposed or in active development and excluded from minimum build dependency. Conceptual / research-only: no operational capability claimed.

SystemStatus / source typeTriSeadon roleRequired workFallback / insertionUnresolved risk
Hull architectureDevelopmental / proposalThree specialized monohullsCFD, model, structure, stability, signatureConventional forms / Flight IWeight and performance
DMCDevelopmental / proposalCommon unmanned controlHuman factors, networks, cyber, certificationExisting control stations / later blockSoftware scope
LCB, ISO, IMM, IWMExisting concepts; integration requiredControlled mission and weapon interfacesInterface control and qualificationFixed installations / phasedWeight, safety, certification
AEGIRDevelopmental / proposalZonal redundant powerFault, protection, shock, power-quality testingProven integrated power distribution / later blockEach zone cannot be assumed to power all loads simultaneously
OdysseyExisting technology; integration required25 MW continuous / 27 MW short-duration objective azimuthing pod familyFull naval hydrodynamic, acoustic, shock, endurance, thermal, and overload testsShaft and rudder / later blockCombatant scale, sprint rating, and survivability
ONE-ConsulDevelopmental / proposalGovernment-controlled common HMISoftware, safety, cyber, data rightsCDS-family consoles / later blockIntegration and governance
CerberusDevelopmental interfaceCommon terminal-defense mount positionsMechanical, power, cooling, arc, software certificationFixed Phalanx, RAM, ODIN or HELIOS fits / phasedNot every payload is interchangeable
APMExisting program basis; integration requiredDedicated large-payload laneHull, exhaust, weapon and safety qualificationNo large payload / later blockWeapon availability and integration
ATLASDevelopmental / proposalCommon berthing outfit inside fixed compartmentsFire, shock, human factors, interfaces and maintainabilityConventional fixed-compartment outfitting / phasedWeight, comfort and installation efficiency
PRIMEExisting battery technology; integration requiredModular reserve and transient powerMWh sizing, fire containment, thermal and naval certificationGeneration and UPS reserve / later blockSafety, endurance, degradation
TrinionDevelopmental / proposalMajor naval gun and ammunition familyWeapon, mount, magazine, barrel, ammunition and fire-control developmentMk 45 Mod 4 or other certified IWM / later blockCost, recoil, ammunition, accuracy
Mk 57 PVLSOperational on DDG 1000; integration requiredObjective VLSProduction and weapon-by-weapon certificationMk 41 VLS IWM / phasedSupport base and compatibility
SPY-6 and Aegis Baseline 10Operational / NavyPrimary radar and combat systemClass-specific array, power, cooling and integrationCertified class baseline / Flight ICost and integration load
SQQ-90Existing / Navy familyASW architecture objectiveClass-specific sensors, processing and acoustic integrationCertified sonar components / phasedConfiguration and self-noise
SEWIPOperational / NavyEW and soft-kill layerClass-specific integrationCertified baseline / Flight ITopside and software integration
HELIOS / ODINExisting demonstration or fleet installation; integration requiredSupplemental directed-energy layerPower, cooling, training, sustainment, doctrineGun and missile CIWS / later blockWeather, dwell, availability
GPIDevelopmental / joint programFuture counter-hypersonic integrationWeapon maturity, launcher and combat-system certificationCurrent layered warning and terminal defenses / futureCost, schedule, performance
UAV, USV, UUVMixed operational and developmentalOff-board sensing, effects and supportLaunch, recovery, data, cyber, maintenance, doctrineHelo and ship sensors / phasedCommunications and autonomy
Anti-railgun interceptionConceptual / research-onlyNo baseline capability claimedModeling and instrumented testingKill-chain disruption and survivabilityPhysical feasibility

Detailed Technology Readiness | Engineering Trades