Maturity Scale

This page intentionally avoids unsupported numeric Technology Readiness Levels. Formal TRLs require program evidence and an authorized assessment. TriSeadon uses descriptive bands until that evidence exists.

Fielded foundationAdaptation and integrationDevelopmentalConceptResearch

1. TriSeadon New-System Readiness

SystemCurrent maturityFielded bridge or fallbackEvidence required for insertion
Class-specific hull architectureConcept design using conventional monohull foundationsConventional Navy hull-form and construction practiceRequirements, arrangements, hydrostatics, CFD, model basin, structure, signatures, damaged stability, survivability, and producibility reviews.
LCB / IWM / IMM architectureConcept interface architecture with class-locked longitudinal and crosswise positionsConventional fixed and modular heavy-system installationsValidate each class placement map, longitudinal and crosswise structure, shock, fire, EMI, services, handling, software, and major-refit insertion through interface-control documents and representative modules.
ISO rapid mission modulesConcept mission-module architectureContainerized mission systems and standardized ship-service connectionsRepresentative modules, securing, power, data, cooling, fire, EMI, handling, port-swap, startup, shutdown, and mission-certification demonstrations.
DMCAdaptation and integrationExisting CIC, aviation, unmanned-system, and vendor control stationsWatchbill, human factors, authority model, bandwidth, cyber, data fusion, degraded operation, and fleet exercises.
AEGIRDevelopmental integrationIPS-derived zonal electric distribution and conventional switchboardsProtection study, fault isolation, load shedding, cross-connect, power quality, cyber, hardware-in-the-loop, and full-scale land-based test.
Odyssey podsAdaptation and developmental integrationShaft and rudder electric propulsion for early hullsClass load cases, hydrodynamics, cavitation, signature, shock, mount, motor, controls, cooling, removal, casualty, and endurance tests.
ONE-ConsulDevelopmental software/HMI architectureCommon Display System and current Navy console familiesGovernment data baseline, safety partitioning, reference implementation, conformance suite, cyber, human factors, latency, and operational test.
CerberusConcept common-mount integrationIndividually installed CIWS, RAM/SeaRAM, laser/dazzler, and sensor systemsMechanical/electrical interface, arcs, recoil, blast, EMI, cooling, data, magazine, safety, alignment, and representative mount swaps.
SCUTUMConcept common light-defense interfaceFielded Mk 46, Mk 38-family, M2, M240, MANPADS, and nonlethal force-protection equipmentInterface-control document, load classes, adapters, recoil and shock, firing arcs, ammunition access, combat-system cueing, human factors, representative swaps, and class-specific installation certification.
APMExisting Navy CPS modernization foundation; TriSeadon four-tube IWM integration newBaseline VLS strike weapons and certified launchersValidate the 60 ft x 25 ft, 40-45 ft total envelope and 600-short-ton reservation; then complete payload, cold-gas launch, shock, safety, combat-system, canister, handling, stability, and ship integration certification.
ATLASConceptConventional fixed-compartment berthing with standardized outfit packagesMockups, egress, fire, shock, noise, sanitation, attachment interfaces, human factors, maintainability, and fleet evaluation.
PRIMEConcept packaging using mature battery building blocksGenerator-backed electric plant and smaller certified energy storage where availableRequired MWh, chemistry, cell/module design, mass, thermal runaway, ventilation, firefighting, shock, crash, deck loads, controls, and abuse testing.
TrinionConcept weapon developmentMk 45 Mod 4 IWMRequirements, gun and mount design, recoil, barrel life, ammunition, magazine, loading, fire control, safety, accuracy, wear, and land/sea firing trials.
Iron Swarm projectile researchResearchMissile, CIWS, EW, decoy, and DEW layersModeling and instrumented testing against representative drones or airborne targets. No anti-railgun or assured counter-hypersonic role is assigned.

2. Current Systems Brought Into the Baseline

FoundationComponent maturityTriSeadon integration statusControl rule
Mk 57 PVLSFielded on Zumwalt class with selected live-fire evidenceNew class integrationEach missile, canister, launcher, ship, and combat-system combination requires approval.
Mk 41 VLSFieldedConcept IWM packagingFielded launcher status does not certify the IWM.
Mk 45 Mod 4FieldedBaseline fallback IWM requires integrationRetain until Trinion qualification is complete.
SPY-6 family / Aegis Baseline 10Production and fleet introductionClass-specific integration and operational test requiredDo not claim performance beyond public test evidence.
CEC, CANES, Link 16/22Fielded familiesNew architecture integrationValidate latency, cyber, interoperability, and degraded operation.
LM2500+G4Production gas-turbine familyGT-generator sled is a new packageQualify the complete package, not only the turbine.
PA6B STC familyProduction engine familyTriSeadon 8 MW generator sled is a proposed packageConfirm rating, dimensions, mass, alternator, isolation, and ship services.
MH-60R/S and shipboard UAS familiesFielded aviation familiesClass aviation, hangar, support, ATC, and maintenance integration requiredAircraft capability does not certify deck, hangar, ordnance, or support arrangements.
CIWS, RAM/SeaRAM, EW, decoys, HELIOS/ODIN pathwaysMixed fielded and developmental maturityCerberus common-mount integration is newTrack each payload separately.

3. Insertion Gates

  1. Need: approved threat or operational requirement.
  2. Maturity: evidence that the system can meet requirements outside the ship schedule.
  3. Interface: mechanical, electrical, cooling, data, software, shock, fire, safety, and human requirements fixed.
  4. Integration: land-based or representative test completed.
  5. Certification: appropriate Navy technical and operational authorities approve use.
  6. Production: supplier, spares, training, documentation, cyber support, and lifecycle funding ready.
  7. Insertion: introduced only in an authorized flight or refit window with a funded fallback.