Year-by-Year Operating Schedule (No Skipped Years)

Key: ST = Starts, BL = Build Lanes (capacity), SIP = Ships In Production, RL = Refit Lanes, DEL = Delivered This Year, CUM = Cumulative Delivered, ACT = Total Active Ships. ACT equals the three CUM class totals; ships still in production are excluded.

Timing: FFG build 24 months, DDG build 48 months, CAG build 60 months. Standard refit every 60 months after commissioning: a 90-day authorized planning window containing a detailed 74-day work schedule and a 16-day margin for delay, rework, weather, retest, and return-to-service work. Major refit remains an exception for approved upgrades, damage, malfunction, casualty, or failure.

Year Starts (ST) Build Lanes (BL) Ships In Production (SIP) Refit Lanes (RL) Delivered This Year (DEL) Cumulative Delivered (CUM) Active Ships (ACT)
FFG DDG CAG FFG DDG CAG FFG DDG CAG Total FFG DDG CAG FFG DDG CAG FFG DDG CAG Total
202920040020020000000000
203020040040040000000000
203120040040040002002002
203230060050050002004004
203330160560170002006006
203430260960390003009009
203540380970613000300120012
2036432812983819100300150015
20374438169871126100400190019
2038551102059121132100401230124
20395521020910171138200402270330
20405531020910191140200531323439
20416611224511211042200542377650
20426621224912229432005534212963
2043663122491223114620165148171075
2044661122451224104620165254221288
2045662122491224945322663602815103
20466631224912241147321661663416116
20476611224512241046332662724018130
2048662122491224945331663784621145
20496631224912241147331661845222158
20506611224512241046332662905824172
2051662122491224945331663966427187
205266312249122411473316611027028200

Phase View (2029-2052)

Phase 1 | 2029-2034 | FFG First + CAG Start

After the implementation delay, FFG opens with three low-rate years at 2/year (2029-2031), then steps to 3/year (2032-2034); CAG starts 1, 2, 3 in 2033-2035, then follows the 2/3/1 cycle from 2036 onward.

Phase 2 | 2035-2040 | DDG Entry + Controlled Growth

DDG enters at 3 in 2036, rises to 4 in 2037, holds 5/year through 2040, then increases to 6/year from 2041 onward; CAG completes its 1/2/3 start sequence and settles into its repeating 2/3/1 cycle.

Phase 3 | 2041-2046 | Balanced Peak Build and Refit Ramp

FFG sustains peak production, DDG reaches and holds peak production, and CAG continues its fixed repeating 2/3/1 cycle while refit lanes scale with fleet size.

Phase 4 | 2047-2052 | Sustained Mixed Production

FFG remains at peak 6/year through program end, DDG sustains 6/year, and CAG continues the 2/3/1 cycle into 2052.

Program Logic (From Chronology Document)

Source: TriSeadon Ship Building chronology.docx

Lane and Refit Structure Snapshot

For full line-by-line source text, open: Chronology Source Detail

Post-2045 Industrial Transition

Continue in Order